Achievements

Achievements

Completed Projects

Photovoltaic Power Plant

Koshi Farm Project Photovoltaic Power Plant

Name of power plantKoshi Farm Project Photovoltaic Power Plant
LocationKumamoto Prefecture
Generated energy outputApproximately 1.0 megawatt

This is a Project that gives back a part of earnings to local agriculture promotion.

Wind Power Plant

Karatsu Minato Wind Power Plant

Name of power plantKaratsu Minato Wind Power Plant
LocationSaga Prefecture
Generated energy outputApproximately 2.0 megawatts

The very first wind power plant delivered by the Shizen Energy Group, with the group being responsible from development to construction. Cooperation was required from a wide range of organizations including local governments, companies and banks for them to work closely to realize the project. 1% of profit is to be given back to local agricultural activities.

Small Hydroelectric Power Plant

Obuse Matsukawa Hydraulic Power Plant

Name of power plantObuse Matsukawa Hydraulic Power Plant
LocationNagano Prefecture
Generated energy outputApproximately 0.2 megawatts

The Shizen Energy Group’s first delivery of a small hydraulic power plant. Development to construction completion handled by Shizen Energy Inc. The project was realized with the cooperation of various local stakeholders including Obuse Town, local financial institutions, and Nagano prefecture. Implemented is the Francis turbine of our small hydraulic power generation project partner, GUGLER Water Turbines GmbH.


Group Achievements

*Developments has plants expected to obtain business operation certification based on the revised FIT Act, or with ongoing regulation EIA.
*Completed Projects has plants our group contributed to with development or EPC as of end-February, 2021.

  • Developments
    948.6MW

    Developments

    This includes joint developments and overseas projects

  • Completed Projects
    616.7MW

    Completed Projects

    This includes overseas projects

  • Operation & Maintenance
    521.0MW

    Operation & Maintenance

  • Asset Management
    235.4MW

    Asset Management

Development

*This includes joint developments

  • Photovoltaic (Solar)
    698MW

    Photovoltaic (Mega Solar)

    *Plants expected to obtain business operating certification based on the revised FIT Act.
    *Includes projects undergoing the recruiting process to share utility costs.

  • Wind
    250MW

    Wind

    *Plants expected to obtain business operation certification based on the revised FIT Act, or with ongoing regulation EIA.

  • Small Hydroelectric
    0.2MW

    Small Hydroelectric

    *Plants expected to obtain business operating certification based on the revised FIT Act.

  • Biomass
    2.0MW

    Biomass

    *Plants expected to obtain business operating certification based on the revised FIT Act.

Completed Projects

*Plants our group contributed to with development or EPC (as of end-June., 2020)

  • Photovoltaic (Solar)
    586.5MW

    Photovoltaic (Mega Solar)

  • Wind
    30.0MW

    Wind

  • Small Hydroelectric
    0.2MW

    Small Hydroelectric

  • Biomass
    0.2MW

    Biomass

IPP: 33

*IPP refers to projects owned by Shizen Energy Inc. or its related companies, or projects invested by Shizen Energy Inc.
or its affiliated companies through special purpose companies, etc.

Operation & Maintenance 

*Plants our group contributed to with development or EPC (as of end-May, 2021)

  • Photovoltaic (Solar)
    417.1MW

    Photovoltaic (Mega Solar)

  • Wind
    4.0MW

    Wind

Overseas

Completed Projects
  • BrazilSolar
    2.2MW

    Brazil

  • ThailandSolar
    5.0MW

    Thailand_rooftop

  • VietnamSolar
    35MW

    Vietnam

  • Developments

    LocationTypeOutput
    BrazilSolar3.1 MW
    IndonesiaSolar1.4 MW
    PhilippinesWind150 MW
    ThailandSolar5.0 MW
    VietnamSolar35MW