Achievements

Achievements

Development Achivements by Type

*This includes joint developments

  • Photovoltaic (Solar)
    1,233.6MW

    Photovoltaic (Mega Solar)

    *Plants expected to obtain business operating certification based on the revised FIT Act.
    *Includes projects undergoing the recruiting process to share utility costs.

  • Wind
    82.0MW

    Wind

    *Plants expected to obtain business operation certification based on the revised FIT Act, or with ongoing regulation EIA.

  • Small Hydroelectric
    0.2MW

    Small Hydroelectric

    *Plants expected to obtain business operating certification based on the revised FIT Act.

  • Biomass
    2.0MW

    Biomass

    *Plants expected to obtain business operating certification based on the revised FIT Act.

Construction Achivements by Type

*Plants our group contributed to with development or EPC (as of Dec. 2023)

  • Photovoltaic (Solar)
    1035.8MW

    Photovoltaic (Mega Solar)
  • Wind
    13.0MW

    Wind
  • Small Hydroelectric
    0.2MW

    Small Hydroelectric
  • Biomass
    0.2MW

    Biomass

O&M Achivements by Type

*Plants our group contributed to with development or EPC (as of  Dec. 2023)

  • Photovoltaic (Solar)
    967.8MW

    Photovoltaic (Mega Solar)
  • Wind
    4.0MW

    Wind
  • Battery
    4.1MW

    Wind

Overseas

Completed Projects

Photovoltaic Power Plant

Koshi Farm Project Photovoltaic Power Plant
Name of power plantKoshi Farm Project Photovoltaic Power Plant
LocationKumamoto Prefecture
Generated energy outputApproximately 1.0 megawatt

This is a Project that gives back a part of earnings to local agriculture promotion.

Wind Power Plant

Karatsu Minato Wind Power Plant
Name of power plantKaratsu Minato Wind Power Plant
LocationSaga Prefecture
Generated energy outputApproximately 2.0 megawatts

The very first wind power plant delivered by the Shizen Energy Group, with the group being responsible from development to construction. Cooperation was required from a wide range of organizations including local governments, companies and banks for them to work closely to realize the project. 1% of profit is to be given back to local agricultural activities.

Small Hydroelectric Power Plant

Obuse Matsukawa Hydraulic Power Plant
Name of power plantObuse Matsukawa Hydraulic Power Plant
LocationNagano Prefecture
Generated energy outputApproximately 0.2 megawatts

The Shizen Energy Group’s first delivery of a small hydraulic power plant. Development to construction completion handled by Shizen Energy Inc. The project was realized with the cooperation of various local stakeholders including Obuse Town, local financial institutions, and Nagano prefecture. Implemented is the Francis turbine of our small hydraulic power generation project partner, GUGLER Water Turbines GmbH.